Organized North to South – updated October 2025
There are currently four completed sections of the Fall Line, though only one is of significant length and connectivity.
As of fourth quarter 2025, there are about 20 miles of the Fall Line under some phase of active construction or completed, and the 13-mile contiguous section between Ashland and Richmond, inclusive of all of Henrico’s segments, should be completed for all trail users in 2027.
Ashland

ASHLAND TROLLEY LINE TRAIL
TRAIL LENGTH: .6 Miles
Status – Completed
- ✓ Ready for trail users!
Trailheads:
Carter Park (availability limited during pool season)
1112 Maple St, Ashland, VA 23005
Ashland Library Downtown Parking
201 S Railroad Ave, Ashland, VA 23005
Hanover

HANOVER “DESIGN-BUILD 1”
TRAIL LENGTH: 4 Miles
Status – Completed
- ✓ Ready for trail users!
Trailheads:
Carter Park (availability limited during pool season)
1112 Maple St, Ashland, VA 23005
Ashland Library Downtown Parking
201 S Railroad Ave, Ashland, VA 23005
Henrico

WOODMAN RD. SECTION
TRAIL LENGTH: .25 Miles
Status – Complete
- ✓ Ready for trail users!
There is no trailhead nearby, currently, but this trail starts proximal to nearby retail parking lots along Brook Road.

VILLA PARK SECTION
TRAIL LENGTH: 1.09 Miles
Status
- ✓ Planning
- ✓ Environmental Review
- ✓ Design
- ▸ Construction to begin 2026

PARK ST. SECTION
TRAIL LENGTH: .3 Miles
Status
- ✓ Planning
- ✓ Environmental Review
- ✓ Design
- ✓ Ready for trail users!
Trailside restrooms and other amenities coming in late 2025!
Richmond

BRYAN PARK SECTION
TRAIL LENGTH: Coming Soon!
Status
- ✓ Planning
- ✓ Environmental Review
- ✓ Design
- ▸ Construction to begin in 2026.
Chester to Petersburg

“DESIGN-BUILD 2“
TRAIL LENGTH: ~10 Miles
Status
- ✓ Planning
- ✓ Environmental Review
- ✓ Design
- ▸ Construction Starting in 2026
Trail Updates
Check out our Trail Updates for more details.